Research review

Copenhagen mobility resilience, turned into a decision-facing review.

This page packages the repository's committed structure, robustness, and reliability outputs into one narrative: network shape, failure sensitivity, line-level delay exposure, and early transfer-risk decisions. It is meant to sit beside the atlas and benchmark as the evidence layer for people who need both presentation quality and methodological traceability.

Static network evidence Observed reliability Risk-model context

Reliability benchmark

E currently anchors the reliable end of the portfolio with a 60s P95 tail.

Intervention priority

Re 4516 should be the first candidate for targeted intervention, with a 780s P95 tail.

Coverage caveat

The committed 24h Task A summary shows 7.3% coverage, so operational completeness should still be read alongside the seven-day conclusions.

Executive View

High-level performance and exposure signals for management review.

Static network size
36,871
50,141 directed edges in the GTFS graph
Lines tracked
44
10 in the leadership band
Worst line tail
780s
Re 4516 is the current upper-tail outlier
Median P95
120s
Portfolio midpoint across ranked lines
Watchlist exposure
20
Lines above a 240s P95 or approaching it
Coverage caveat
7.3%
24h Task A snapshot, use as operational evidence not service truth
Targeted attack penalty
42.1x
Random vs targeted LCC ratio at 15% removal

Leadership story

E leads the portfolio with a 60s P95. The company-facing message is that the network already has visibly dependable services worth using as operational benchmarks.

Immediate risk

Re 4516 reaches a 780s P95 tail. That is where delay communication, schedule padding, and intervention planning should start.

Structural fragility

At 15% node removal, targeted failures shrink the largest connected component from 0.600 to 0.014. The network is bridge-sensitive, not evenly resilient.

Interactive Line Portfolio

Filter the reliability ranking, focus a single line, and compare its tail delay against the broader portfolio.

Portfolio context

The ranking chart responds to the active filter. Click a row to pin a line.

Line Band Rank P50 P90 P95 Average Samples

Geographic Exposure

The map is a schematic coordinate view built from GTFS stop locations. It highlights where connectivity concentration and vulnerability overlap.

Static network map

No external basemap is used. This view intentionally stays offline and reproducible inside the repo.

Selected node

Critical bridges Top hubs
stoptypemetricvalue
Skive TrafikterminalhubDegree42
Odder BusterminalhubDegree35
Randers BusterminalhubDegree35
Hadsten St./ØstergadehubDegree27
Middelfart Station (Middelfart Kommune)hubDegree22
Haderslev BusstationhubDegree22
Hobro Busterminal (H.I. Biesgade)hubDegree20
Rosen Allé (Ribe)hubDegree17

Decision Support Layer

Static fragility, observed delay patterns, risk-model confidence, and route trade-offs are shown together so the research can support operational decisions.

Failure sensitivity

Largest connected component retention under random and targeted removals.

0.00.20.40.60.81.09%15%30%random vs targeted

Observed delay tail by hour

P95 delay profile in Copenhagen local hour.

0s105s210s315s420s910111213

Mode-level risk model

Current model remains mode-level with explicit fallback logic when sample sizes thin out.

linemodep95CI lowCI highevidencesource
CST120s0s0slowglobal
FST120s0s0slowglobal
HST120s0s0slowglobal

Router trade-off table

Sample candidate paths show the travel time versus robustness trade-off.

odpathtravel timetransfersmiss probCVaR95confidence
CPH_H_CPH_AIRPORTpath_a24.0 min10.0834.0 minmedium
CPH_H_CPH_AIRPORTpath_b28.0 min00.0834.0 minmedium
NORREPORT_LYNGBYpath_a22.0 min10.0834.0 minmedium
NORREPORT_LYNGBYpath_b26.0 min00.0834.0 minmedium
Week 1 connectivity profile

Week 1 connectivity profile

Static connectivity footprint of the national GTFS graph used as the baseline.

Week 2 targeted vs random

Week 2 targeted vs random

Published robustness curve comparing random failures to betweenness-targeted attacks.

Week 3 line reliability

Week 3 line reliability

Committed seven-day line ranking by P95 delay.

Week 3 daypart pattern

Week 3 daypart pattern

Delay tail by Copenhagen local hour from the committed BQ-derived analysis.

Provenance

The dashboard is generated from committed markdown, CSV, JSON, and PNG artifacts so it remains auditable and safe to open locally.

week1_summary../../docs/week1_summary.md
robustness_summary../../results/robustness/summary.md
robustness_nodes../../results/robustness/top10_vulnerable_nodes.csv
week3_summary_json../../data/analysis/reports/week3/dt=2026-03-02/summary.json
week3_reliability../../data/analysis/week3_line_reliability_rank.csv
hour_quantiles../../data/analysis/week3_hour_dow_quantiles.csv
router_table../../data/analysis/router_pareto_table.csv
risk_model../../data/analysis/risk_model_mode_level.csv